Final preparations are underway to install a landmark railway bridge in Birmingham that will become the longest single-span railway structure in the West Midlands.
Key Points:
👉 2,600-tonne structure
👉 Pre-assembled by contractor Skanska over the last 22 months in a huge compound beside the existing railway lines.
👉 The 92-metre-long bridge in Stechford will be driven into place to allow HS2 tracks to pass underneath it.
👉 Eighteen huge remote-controlled transporters will drive the metal and concrete bridge into place
👉 Each self propelled modular transporter has 24 wheels, meaning 432 wheels will carry the load.
Click the link to watch the video and find out more: https://www.linkedin.com/feed/update/urn:li:activity:6929766872166895616





